Warehouse Putaway Process
Putaway is the moment stock stops being “on the dock” and becomes pickable. Skip it, and your WMS shows inventory that nobody can find. Rush it, and cartons land in the wrong bay for a week. A clear warehouse putaway process is usually 6 to 10 minutes per pallet for a small team, not a second system.
This article covers steps from the receiving area to a confirmed bin, with VORQ product language you already use for Receive stock, Storage sites, and later Scan to deduct.
Answer first: what good putaway looks like
Good putaway means every received quantity has a labelled home, the bin code matches the system location, and the next picker can scan without hunting. For a receipt of 60 cartons of FLR-120, that means 60 units leave receiving, arrive at something like A-03-B-02, and stay there until dispatch burns the batch down.
If your bin naming is still fuzzy, fix that before you polish putaway speed. Use warehouse locations and bin codes to set a convention once, then train putaway against it.
Where putaway sits in the inbound chain
- Delivery arrives and checks complete (see the receiving SOP).
- Receive stock books quantity and prints QR labels.
- Putaway moves labelled stock to a Storage site location.
- Inventory views and Low stock reflect what is truly available to pick.
Receive stock without putaway creates a parking lot of truthful but unusable stock. Putaway without receive creates tidy shelves that the system does not know about. Do both, in that order.
Step-by-step putaway process
1. Stage in a marked receiving area
Keep inbound in a painted or taped zone until labels exist. Mixing unlabelled cartons with pick faces is how FLR-120 from PO-4821 ends up beside last month’s leftover. Aim to clear the stage within one shift for fast movers.
2. Confirm labels match the receipt
Spot-check at least 5 labels on a 60-unit receipt: product, quantity context, and readable QR. If a label sheet jammed and only 55 printed, stop and reprint before anyone rolls a pallet.
3. Choose the destination bin
Use your Storage sites map. Prefer the primary pick bin when replenishing a face. Prefer bulk overflow when the pick bin is full. Write the bin on the putaway ticket or device screen so the mover does not invent A-03-C-01 because it looked empty.
4. Move the whole receipt quantity
If you received 60, put away 60. Partial putaway (40 to the bin, 20 left in the aisle “for later”) recreates the spreadsheet problem inside the building. If you must split across two bins, record both locations deliberately, not as a forgotten remainder.
5. Confirm the bin in the system
When VORQ records location on receive or when you update location after the move, confirm the bin code matches the physical label on the rack. A wrong bin in software is a silent miss on every future pick.
6. Clear the stage and release for picking
Once the stage is empty and locations match, the batch is fair game for Scan to deduct. Tell the shift lead if a hot order was waiting on this inbound.
Putaway checklist (print or pin)
| Step | Check | Pass criteria |
|---|---|---|
| 1 | Stage clear of other SKUs | Only this receipt’s cartons in the bay |
| 2 | QR labels applied | Every outer carton scannable |
| 3 | Bin selected | Matches Storage sites plan (e.g. A-03-B-02) |
| 4 | Quantity moved | Physical count equals receipt (e.g. 60) |
| 5 | Location confirmed | System bin equals rack label |
| 6 | Stage emptied | Receiving area ready for next drop |
Rules that keep putaway boring (in a good way)
- One SKU face where possible. Mixing three products in one bin to “save space” costs more in pick errors than the shelf centimetres you gain.
- Heavy below, fragile above. Putaway is also damage prevention. A 20 kg carton on a light pick shelf fails twice.
- Do not break sealed inners unless the pick unit needs it. If you sell cartons of 10, put away cartons of 10.
- Replenish pick bins from bulk on a schedule. Ad hoc top-ups during peak create half-finished putaways.
- Photograph odd placements only when you deviate (oversized item on the floor). Notes beat memory.
Multi-site and transfer putaway
If stock arrives at Site North and must live at Site South, finish receive and putaway at North first, then raise a proper Transfer. Do not “put away” by loading a van with no transfer document. In-transit quantity must be visible, or both sites will sell the same 60 units.
Van stock and satellite rooms are Storage sites too. Putaway there still needs a bin or named location, even if the “aisle” is a single shelving unit.
How putaway quality shows up later
Stock counts go faster when bins match reality. Low stock alerts mean more when available quantity is actually on a pickable face. Dispatch via Scan to deduct fails less when the labelled batch sits where the system says.
Measure putaway with two simple metrics for 30 days: average minutes from receipt confirm to bin confirm, and number of “cannot find inbound” tickets per week. Most small warehouses cut those tickets in half once labels and bin codes are non-negotiable.
On busy days, assign one person as putaway lead for inbound over 40 cartons. Parallel picking through an unfinished stage creates more lost time than a 15-minute dedicated putaway block.
For the inbound booking that feeds putaway, use receiving stock. To see how this fits a full WMS picture, read what a warehouse management system is. Ready to run locations properly? Start at signup or review pricing.